The work performed under the contract was the construction of a new Sanitary Sewer System at Fort Allen Training Center consisting of the installation new 8” and 10″ diameter lines and new manholes. This project included the demolition of existing manholes, and the grouting and abandoning existing asbestos/concrete pipes. The new system is comprised of 20,079 LF of new sanitary sewer line with manholes that carry sanitary or domestic wastes, normal laundry wastes, and some industrial wastes requirements for the PRANG Fort Allen Facility.